We offer free standard shipping to every province and territory in Canada.
We offer free standard shipping to every province and territory in Canada. No minimum purchase is required, and all orders include tracking for your convenience.
We offer a 30-day return policy, which means you have 30 days after receiving your item to request a return. For Patio, Lawn & Garden items, returns are only accepted for products that arrive damaged, defective, incorrectly shipped, or in a condition that is the fault of the seller.
To be eligible for a return, your item must be in the same condition that you received it — unused, with all original packaging, tags, manuals, parts, and accessories included. Items that show signs of use, installation, outdoor wear, assembly, or damage caused after delivery cannot be returned.
You will also need your receipt or proof of purchase.
To start a return, contact us at gardencanada.ca@gmail.com
All approved returns must be sent to the following address:
Garden Canada – Returns Department
2601 E 28th St, STE 005
Signal Hill, California
United States
If your return is accepted, you will receive a prepaid return shipping label (when applicable) along with detailed instructions on how and where to send your package.
Items sent back without first requesting a return will not be accepted.
You can always reach us at gardencanada.ca@gmail.com for any return-related questions.
Damages and Issues
Please inspect your order upon delivery and contact us immediately if your item is damaged, defective, incorrect, broken, missing parts, or arrives in poor condition. We will evaluate the issue and make it right.
For seller-caused issues (damaged, defective, incorrect), Garden Canada will cover the return shipping cost.
Exceptions / Non-Returnable Items
The following items cannot be returned:
If you are unsure about your item’s return eligibility, please contact us before sending it back.
Exchanges
Exchanges are only available for unused items that arrived damaged, defective, or incorrect. The fastest way to receive the item you want is to return the original (if eligible) and place a new order once your return is approved.
European Union 14-Day Cooling-Off Period
If your order is shipped into the European Union, you have 14 days to cancel or return the item for any reason. However, Patio, Lawn & Garden items must still be unused, in original condition, and in their original packaging with all included parts and accessories.
Refunds
Once we receive and inspect your return, we will notify you whether the refund was approved. If approved, your refund will be processed to your original payment method within 10 business days.
Please note that your bank or credit card provider may require additional time to process and post the refund.
If more than 15 business days have passed since your refund was approved, please contact us at gardencanada.ca@gmail.com
Deliveries to Canada’s outer and remote regions may experience seasonal delays caused by severe weather or limited carrier availability. We appreciate your patience and recommend allowing additional time for your order to arrive safely.
Transform your outdoor growing space with the Winpull Raised Garden Bed Kit. Crafted from double-layer galvanized steel and finished with an anti-rust coating, this planter resists the wear of rain, sun, and seasonal changes while maintaining a clean, contemporary look. The oval profile provides a softer silhouette that blends with lawns and patios, and the sturdy frame is designed for repeated use across seasons. Thoughtful engineering supports stable soil containment, even when you fill the bed with rich compost and thriving plants.
The walls offer robust resilience with an average thickness of 0.67 mm, and thicker sections up to 1.2 mm. Multi-screw reinforcement helps preserve shape and strength over time. Galvanized material and hardware resist rust, so this bed stays solid and reliable for years of gardening seasons.
At 72 inches long, 36 inches wide, and 12 inches high, the bed provides generous space for vegetables, herbs, and flowers. The top edge features a black rubber sealing strip to reinforce the edge and protect hands during planting and maintenance. The open design keeps a tidy appearance while allowing you to manage soil more easily.
Designed for quick setup, the kit includes garden gloves and a screwdriver. Most users complete the assembly in about 15 minutes and can start planting soon afterward, enjoying a sturdy frame without complicated tools.
The open-base design supports better drainage, aeration, and soil improvement opportunities. It also makes it easier to add compost or yard debris to enrich the planting medium while keeping weeds at bay under the raised bed walls.
With its neutral silver finish, the raised bed complements patios, decks, backyards, or community gardens. It creates a defined growing space that can host a mix of vegetables, herbs, and flowering plants, adapting to different seasonal needs.
Q: What are the dimensions of the Winpull Raised Garden Bed Kit?
A: It measures 72 inches long by 36 inches wide by 12 inches tall, offering a generous planting area.
Q: What is included in the kit and how long does assembly take?
A: The kit includes garden gloves and a screwdriver; assembly typically takes about 15 minutes.
Return Policy
We offer a 30-day return policy, which means you have 30 days after receiving your item to request a return. For Patio, Lawn & Garden items, returns are only accepted for products that arrive damaged, defective, incorrectly shipped, or in a condition that is the fault of the seller.
To be eligible for a return, your item must be in the same condition that you received it — unused, with all original packaging, tags, manuals, parts, and accessories included. Items that show signs of use, installation, outdoor wear, assembly, or damage caused after delivery cannot be returned.
You will also need your receipt or proof of purchase.
To start a return, contact us at gardencanada.ca@gmail.com
All approved returns must be sent to the following address:
Garden Canada – Returns Department
2601 E 28th St, STE 005
Signal Hill, California
United States
If your return is accepted, you will receive a prepaid return shipping label (when applicable) along with detailed instructions on how and where to send your package.
Items sent back without first requesting a return will not be accepted.
You can always reach us at gardencanada.ca@gmail.com for any return-related questions.
Damages and Issues
Please inspect your order upon delivery and contact us immediately if your item is damaged, defective, incorrect, broken, missing parts, or arrives in poor condition. We will evaluate the issue and make it right.
For seller-caused issues (damaged, defective, incorrect), Garden Canada will cover the return shipping cost.
Exceptions / Non-Returnable Items
The following items cannot be returned:
If you are unsure about your item’s return eligibility, please contact us before sending it back.
Exchanges
Exchanges are only available for unused items that arrived damaged, defective, or incorrect. The fastest way to receive the item you want is to return the original (if eligible) and place a new order once your return is approved.
European Union 14-Day Cooling-Off Period
If your order is shipped into the European Union, you have 14 days to cancel or return the item for any reason. However, Patio, Lawn & Garden items must still be unused, in original condition, and in their original packaging with all included parts and accessories.
Refunds
Once we receive and inspect your return, we will notify you whether the refund was approved. If approved, your refund will be processed to your original payment method within 10 business days.
Please note that your bank or credit card provider may require additional time to process and post the refund.
If more than 15 business days have passed since your refund was approved, please contact us at gardencanada.ca@gmail.com
All orders are processed within 2–3 business days after payment confirmation. Orders placed on weekends or holidays will be processed on the next business day.
If there is any delay in preparing your order, we will notify you promptly by email.
Garden Canada ships exclusively within Canada across all provinces and territories.
Standard delivery: Total delivery time is approximately 5 business days (2–3 business days processing plus delivery time).
Remote or northern regions: 6–10 business days due to distance, weather conditions, and limited carrier routes.
Deliveries to areas such as Yukon, Northwest Territories, Nunavut, and certain rural communities may take longer because of seasonal and logistical factors.
While we always aim for timely deliveries, once a package is handed over to the carrier, Garden Canada is not responsible for carrier delays, service interruptions, or weather-related disruptions.
Once your order has shipped, you will receive a shipping confirmation email containing your tracking number and a link to track your shipment.
Tracking details typically become active within 24–48 hours after shipment.
Shipping within Canada is free on all orders.
Expedited or express delivery options may be available at checkout for an additional fee depending on your location.
Please ensure your shipping address is complete and accurate before placing your order. Garden Canada is not responsible for delays, lost shipments, or delivery issues caused by incorrect or incomplete address information.
If your order arrives damaged, please contact us immediately at gardencanada.ca@gmail.com with clear photos of the package and its contents. We will review the situation and assist you as quickly as possible.
If your package is marked as “delivered” by the carrier but you have not received it, please first:
If the issue remains unresolved, please email us and we will help initiate a carrier inquiry or claim when applicable.
At this time, Garden Canada ships only within Canada. International shipping options may become available in the future.
If you have any questions regarding shipping, please contact us at: gardencanada.ca@gmail.com
Thanks for subscribing!
This email has been registered!